Ditch Clearance Along A46
Scope of Works: All vegetation alongside a section of the A46 was to be removed to facilitate the re-digging and profiling of the ditch, preventing future road flooding. As the first contractors on site, we had a tight timeframe to complete the clearing work before civil contractors could proceed with the next phase of the project. Mechanised equipment was utilised to remove trees, shrubs, and debris, ensuring the site was fully prepared for the subsequent civil works.
Equipment used: 8T Excavator, grab & shear. Multiple 8 inch tracked chippers, all chipped back to site.